Closed a 9-point gap to industry benchmark
Revenue 2.6× in 17wks
Diagnosed a 74% funnel drop at a single checkout step. Redesigned the flow in 2 sprints. The result held for 17 consecutive weeks.

Key results
+163%
+11pp
~32%
17wks
Weekly Order Entry Growth
Completion Rate Lift (from 21% → 32%)
Checkout Completion
Durability Sustained Growth

One redesign.
Two sprints.
2.6× for 17 weeks.



Quantitative data showed a 74% drop at the billing and shipping step. Hotjar sessions showed why: once a user receives a price and lead time, they've completed their primary goal. Everything after that reads as friction with no perceived value. The decision wasn't to redesign the billing section — a competitive analysis and mid-fidelity prototyping showed that path was high effort, low return. Instead, I aligned the CEO, CTO, marketing lead, and sales lead on a leaner bet: reduce steps, reuse existing components, ship in 2 sprints.
The result held for 17 consecutive weeks.

I work from the data out — diagnosis first, design second.
If that's the kind of thinking you need, reach out.
Selected Works
Signup Funnel RedesignProject type
ChilimaniliPro-bono UX/UI Work
Buena OndaDesign Sprint
BeKindPro-bono UX/UI Work
EvaaUI Work